Costing at the time £1.8 million to complete, the Severn Tunnel was a Victorian engineering triumph, and for over a century it remained the longest rail tunnel in Britain. Construction had begun in 1873 but came to a standstill after the workings were inundated by water in 1879. An accomplished civil engineering contractor, Thomas Andrew Walker (1828–89) had worked on railways in Canada, Russia and Africa as well as on London's new underground lines; he was therefore well qualified to complete the Severn Tunnel, which was achieved in 1886. First published in 1888, Walker's first-hand account of the problematic project remains an engaging source for railway and engineering historians, and its detailed account of the ground encountered will also interest geologists. Replete with plans and maps, reissued here is the second edition of 1890, the year following Walker's death, which is likely to have been hastened by overwork.
Les mer
Preface; Introductory note; 1. Description of the estuary of the Severn; 2. The early history of the undertaking; 3. The commencement of the works; 4. The final struggle; 5. Great snow-storm; 6. Tunnelling; 7. A year of good progress; 8. Further progress and greater troubles; 9. A week of troubles; 10. The means taken to deal with the great spring; 11. Side-heading driven to big spring; 12. The men by whom the work was done; Appendix.
Les mer
The 1890 second edition of contractor Thomas Walker's first-hand account of the construction of a Victorian engineering triumph.

Produktdetaljer

ISBN
9781108063401
Publisert
2013-06-27
Utgiver
Vendor
Cambridge University Press
Vekt
470 gr
Høyde
244 mm
Bredde
170 mm
Dybde
15 mm
Aldersnivå
U, P, 05, 06
Språk
Product language
Engelsk
Format
Product format
Heftet
Antall sider
290

Forfatter